Curated Q&A on green energy construction, system integration, and subsidy applications to help you understand our services.

What green energy solutions does Shi-He Intelligent provide?

We provide solar, storage, electrical protection, and EMS integration, including installation, testing, and operator training.

What is a Solar-Storage Hybrid System?

Solar-storage connects solar generation and batteries to designated loads. A completed manufacturer project uses an 11 kW hybrid inverter and a 20 kWh battery to supply a 7 kW air conditioner.

What is an EMS (Energy Management System)?

An energy management system (EMS) brings meter and equipment data into a dashboard for energy tracking, alerts, and report exports. Control support depends on device interfaces.

What government subsidies are available for net-zero transformation?

Consider smart carbon reduction, equipment improvements, or R&D services. We have experience with three completed 2024 commercial-service carbon-reduction project reviews. Share your industry, planned equipment changes, and budget to discuss suitable directions and current eligibility.

How long does it take to build a solar PV system?

Industry reference estimates are 18 to 20 weeks for the full process, including 2 to 4 weeks of site construction. With complete documents, Taipower distribution-level interconnection review takes at most 14 working days. Taoyuan generally issues consent registration or a correction notice within six days from the day after receipt, excluding holidays. Equipment lead times, document corrections, roof reinforcement, and additional grid connection work can affect the schedule. Storage also requires fire safety design. Solar costs depend on installed capacity and roof work. Storage is quoted separately by power rating and battery capacity.

Can't find what you're looking for?

Share equipment, location, and the problem to solve so we can discuss engineering and system scope.