Skip to main content
Factory Saving/ESCO

Hsinchu High-Tech Fab HVAC Saving

HVAC energy-saving retrofit for high-energy-consuming factories, introducing maglev chillers, saving over 3.5M TWD annually.

Hsinchu High-Tech Fab HVAC Saving

Key Indicators & Tech Specs

  • Scale Chiller 1500 RT
  • Subsidy Assisted MOEA Energy Saving Subsidy
  • ROI Period 2.8 Years
  • Main Services HVAC Retrofit / ESCO

Project Intro & Challenges

This ESCO project covered design, construction, and acceptance. The core was replacing old chillers with high-efficiency maglev units and optimizing cooling towers and pump frequency control.

Using EMS AI optimization, we ensured the air conditioning system operates at minimum energy consumption while meeting strict process temperature/humidity requirements. The client achieved ROI in 2.8 years, significantly boosting ESG performance.

Client Benefits Feedback

Lifespan

Extended by 5 Years

Annual Saving

3.5M TWD

Carbon Reduction

480 Tons CO2e/Year

Have similar project needs?

We can tailor a customized solution that meets your ESG goals and energy-saving needs.

Book 1-on-1 Consultation