Site planning and engineering coordination

Green Energy & Storage Construction

Connect solar generation, batteries, and site loads, with installation, electrical protection, and operator training.

Site review

Structure, energy use, space, and equipment conditions

Configuration planning

System, protection, procedures, and maintenance arrangements

Engineering coordination

Construction, testing, handover, and operations work

Solar Power System

Install solar modules, mounting structures, inverters, and wiring to connect rooftop generation to the electrical system.

Energy Storage System (BESS)

Connect batteries, inverters, and electrical protection to designated loads, and set up charging, discharging, and operator interfaces.

EMS Energy Management System Integration

Bring readings, equipment status, and alerts into a dashboard with energy records and maintenance information.

Wind-Solar Hybrid & Microgrid

For remote sites or limited grid supply, solar, wind, and storage can serve designated loads. Generation and backup configurations depend on site resources and equipment capability.

  • Connect generation, storage, and designated loads
  • Provide operator interfaces and protection design
Solar PowerSOLARWind PowerWINDEnergy Storage SystemESSFactory LoadFACTORY
System Status: OPTIMAL
New Service

Micro Home/Small C&I Storage

Homes and small businesses can use solar-storage for designated equipment, with batteries, inverters, and protection design.

Power for Designated Loads

Connect solar and storage to equipment that needs power, with matching electrical distribution and controls.

Energy and financial review

Itemize equipment, installation, and maintenance costs, then compare configurations using energy records.

Safety and maintenance planning

Provide electrical protection, operating instructions, and repair contacts so users understand device limitations.

View micro-storage evaluation topics

Small solar-storage installations connect batteries, inverters, electrical protection, and operator interfaces to designated loads.

Installation and Safety Scope

  • Battery and inverter specifications and operating instructions
  • Electrical protection, ventilation, and installation space
  • Fire safety, electrical work, and applicable grid-connection procedures
  • Installation, testing, and maintenance services

Backup and off-grid functions require confirmation from device specifications and site tests.

System planning focus

  • View readings and alerts through the operator interface.
  • Provide inspection, repair, and exception-handling instructions.
  • Design electrical distribution and protection for the location and use.
FAQ

Green Energy & Storage FAQ

Common questions regarding solar energy, energy storage systems, and green power implementation

What green energy services does Shi-He Intelligent provide?

We provide solar, storage, electrical protection, and EMS integration, including installation, testing, and operator training. A manufacturer’s rooftop solar-storage air-conditioning installation passed acceptance testing.

What is a Solar-plus-Storage system?

A solar-storage system connects solar generation and batteries in one supply arrangement for designated loads. A completed manufacturer project uses an 11 kW hybrid inverter and a 20 kWh battery to supply a 7 kW air conditioner.

Which financial items are reviewed for a solar-storage system?

Compare itemized equipment, installation, and maintenance costs, plus the configuration’s effect on electricity use. Share bills, load schedules, and site details to compare costs and operation across options.

How can Shi-He help with a company’s renewable-energy or electricity requirements?

We can assess solar-storage configurations, energy needs, and engineering scope, and prepare equipment and application documents. Share the applicable requirement documents to discuss technical options and items for compliance review.

My factory roof structure is old; can I still install solar panels?

Older roofs need structural and waterproofing assessment before selecting installation methods or reinforcement. Share building drawings and roof photos to arrange a survey and required professional assessments.

What records should we prepare when planning renewable-electricity use?

Prepare energy records, site details, intended use, and existing power-purchase contracts. Certificates also require clear rights and use requirements. We can organize engineering and generation-equipment records.

How is the safety of the energy storage system guaranteed? Can it provide power immediately during a blackout?

Safety provisions include electrical protection, ventilation, fire safety, and exception handling. Outage supply requires backup or off-grid capability and suitable switching. Share essential loads to discuss supply coverage and testing.

How long does the entire process take from evaluation to grid connection?

Industry reference estimates are 18 to 20 weeks for the full process, including 2 to 4 weeks of site construction. With complete documents, Taipower distribution-level interconnection review takes at most 14 working days. Taoyuan generally issues consent registration or a correction notice within six days from the day after receipt, excluding holidays. Equipment lead times, document corrections, roof reinforcement, and additional grid connection work can affect the schedule. Storage also requires fire safety design. Solar costs depend on installed capacity and roof work. Storage is quoted separately by power rating and battery capacity.